Governor Wisley Rotich on Monday commenced Ward development tours beginning with Arror where he had a long day of interaction with the locals.
The County boss inspected several completed projects, as well as others that are at different levels of construction.
He also distributed cheques to Barsumbat, St. Benedicts Girls, Koitilial, and Kapkata Secondary Schools to boost student enrollment.
Additionally, farmers from the Kabonon–Kapkamak Irrigation Scheme benefited from the programme.
To date, the Governor says his administration has done the following projects and programmes in Arror Ward:
Health Facilities:
• Upgrading of Kapchemutta Health Facility, which includes:
– Construction of a modern OPD
– Construction of Male and Female Wards
– A minor theatre
– Equipping the facility with single-crank beds, a dental chair, wheelchairs, cabinets, laptops, waiting benches, and curtains
– Construction of an incinerator
• Construction and equipping of Tunyo Funeral Home
• Construction of Kapkata Dispensary ablution block
• Renovation of Kapkata Dispensary
• Construction of staff houses at Kilos Dispensary
Roads (constructed and maintained):
• Kisewen–Kapkata road maintenance
• Kisewen Water Project road opening
• Construction of Kipkaner–Chepkewa road
• Construction of Katipkoitoi–Kaitkwen road
• Construction of Kapsogom–Kopus road
• Ongoing construction of Barsumbat–Bridge road
• Kakamet–Barsut road
• Arror Centre–Chepkewa road
• Koitilial–Centre road
• Arror Girls road
• Embosiro–Barsoti road improvement
• Arror Bridge–Kobus road
• Kapchemutta–Kobus road
• Kapsawach road opening
• Extension of road and drift of Chepsigor–Kaparagon road
• Embo Kamwanda–Kobus road opening
• Arror–Chepsigor–Chepkewa road grading, murraming, and compaction
Water projects:
• Koitilial Centre borehole
• Chesuman borehole
• Tunyo Dispensary borehole
• Kilos borehole
• Kopus–Kapnyanchar Water Project pipeline extension
• Rehabilitation of Chebilat Water Project
• Sego–Utwo Water Project pipeline extension
• Ononoi–Kapcheplok Water Project pipeline laying
• Kongut–Embat Water Project pipe laying and extension
• Kisewen pipeline extension
• Construction of a 50m³ Kapkoimur water tank
• Kiptalat Water Project pipeline extension to Tunyo Dispensary
• Construction of a 50m³ Kaptol water tank
• Construction of Luguk water intake
Agriculture, Livestock Production, and Irrigation:
• Extension of Kapkemet–Kapkoros fence
• Renovation of Tokota cattle dip
• Rehabilitation and expansion of Kamsiwet irrigation scheme
• Repair, maintenance, and purchase of pipes for Kabonon–Kapkamak Irrigation Scheme
• Installation of a lateral line for Kamugon–Embosiro–Kakamet–Chepten–Main A–Barsoti–Moron–Totab Chesewet furrow
• Rehabilitation of Kaborin–Kapnyanjar furrow
• Construction of Kibiyo water trough
• Training of farmers
• Construction of a slaughterhouse at Koitilial
• Kapchepkee water furrow rehabilitation
• Fencing of Kapkamak–Kabonon irrigation scheme
• Kwongot–Tomko water furrow fencing
Early Childhood Education and Technical Training:
• Constructed Chepkum ECDE twin classrooms
• Constructed a modern 40-bed boys’ dormitory with cubes at Koitilial VTC
• Constructed a modern 40-bed girls’ dormitory
• Fenced Koitilial ECDE
• Equipped Koitilial VTC
• Disbursed bursaries for our students in different learning centres
• Introduced digital learning and capitation for our learners.



RECENT COMMENTS